A Vance company - serving Chandler, AZ

FAAC Hinge & Roller Replacement Nationwide

Every visit starts with

Free on-site gate assessment - hinges, posts, and your LiftMaster or Nice gate operator checked before anything is quoted

The assessment is free and the quote is the invoice.

Styles & brands we work with

Wrought iron
Wrought iron
Wood & steel frame
Wood & steel frame
Farm & ranch
Farm & ranch
Sliding driveway gates
Sliding driveway gates
LiftMaster operators
LiftMaster operators

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

FAAC Hinge & Roller Replacement: The Chandler Owner’s Guide

FAAC hinge and roller replacement in Chandler typically runs $280-$520 installed, depending on whether we’re working on a single residential swing gate or a dual-leaf system with underground operators. We stock FAAC-compatible hinge and roller assemblies for the 400, 422, and S800 series on every truck, and most Chandler calls are completed same day. Homeowners usually notice the problem first as a grinding scrape at the end of the swing arc, or the gate starts hanging lower on the closing side, especially after our monsoon season when dust and grit work into the roller housing.

Call (520) 827-3159

Which FAAC Models This Applies To

FAAC organizes its residential and light commercial line into swing operators (the 400 and 422 series), articulated arm units (the 391 and 412 series), and the heavier S800 underground range. The hinge and roller hardware differs across these lines in ways that matter for ordering. The 400 series uses a 16 mm diameter roller pin with a sealed ball bearing; the S800 jumps to a 20 mm pin with a heavier cast hinge body to handle the torsion load of an in-ground motor. If you’re trying to identify your unit, the model plate sits on the motor housing, usually behind a small plastic cover. Write down the full string, something like “422 CBAC” or “S800 SBW,” because the suffix determines the factory hinge offset.

We carry both OEM FAAC hinge and roller kits and a quality Italian aftermarket equivalent from Comunello that matches the same tolerances. The OEM part runs higher, naturally, but for a 400-series residential gate in Chandler, the aftermarket unit carries the same 365-Day Done Right Promise and saves roughly $60-$90 on the installed price. We don’t steer toward OEM unless the gate is under factory warranty or the hinge geometry is proprietary to an older S800 installation. Under Haven Standard Clause 1, we write both options on the quote and let the homeowner choose before we unload the truck.

Signs Your FAAC Hinge & Roller Replacement Is Failing

Gloved hand inspecting damage on a metal gate post for repair
Signs Your FAAC Hinge & Roller Replacement Is Failing
  • The gate drags or scrapes at the latch post. The roller bearing has worn enough that the gate leaf is dropping on the hinge side, changing the sweep geometry. In Chandler, we see this accelerated by dust infiltration past the bearing seal, especially on properties near the Agua Fria Freeway corridor where construction dust is constant.
  • A rhythmic clunk at the end of each open or close cycle. This is the roller flat-spotting, meaning the bearing race has collapsed in one section. The motor still pushes through, but the impact load transfers straight to the operator arm and can strip the internal limit-switch cam over time.
  • Visible rust weeping from the hinge barrel. The zinc plating on budget replacement hinges fails after two or three Arizona summers. Once moisture gets under the plating, the hinge pin seizes and the operator motor draws excess amperage, which shows up as premature board failure.
  • The gate swings freely when the operator is disconnected. A healthy hinge and roller assembly has controlled resistance. If the gate flops with no drag, the roller has separated from its inner race and the hinge is running metal-on-metal.
  • The operator “hunts,” reversing or stalling mid-travel. The control board reads the amperage spike from a binding hinge as an obstruction. We traced this exact symptom last month in a Chandler Heights installation where the roller had seized but the homeowner assumed the motor was failing.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

For a standard single-leaf FAAC swing gate in Chandler, hinge and roller replacement runs $280-$380. Dual-leaf systems or S800 underground operators with the heavier cast hinge body land at $420-$520. That range includes the part, labor, alignment check, and a full cycle test with amperage readings before we leave.

What moves the price: whether the hinge bracket welded to the post is still square (if it’s twisted, we cut and re-weld), whether the roller is seized onto the pin (extraction time varies), and whether the gate leaf itself has sagged enough to need re-hanging. We quote every scenario in writing before starting. Under Haven Standard Clause 1, the flat price you sign is the price on the invoice. If we find something unexpected, we stop, explain, and get a revised signature. No surprises.

The 365-Day Done Right Promise covers the full installation. If the hinge binds, the roller chatters, or the gate drifts out of alignment within that window, we return and make it right at no charge. Under Clause 4, you also get a photographed record of the old part, the new part number installed, and the gate’s resting position when we finish.

DIY or Call Us?

Professional welder performing iron gate repair service
DIY or Call Us?

There’s a safe middle ground here, and then there’s the point where a homeowner risks the gate leaf. You can safely inspect: check the hinge barrel for rust streaks, rock the gate manually to feel for play, and verify the model number on the operator housing. What you should not attempt is removing a loaded hinge pin on a wrought-iron gate leaf that weighs 200-plus pounds. The pin is under shear load, and without a proper jack or temporary support, the leaf can shift and pinch or drop. We’ve been called to Chandler jobs where a well-meaning owner freed the pin, the gate twisted, and the repair became a re-hang plus new operator arm.

If your FAAC gate is showing any of the symptoms above, call (520) 827-3159. We’ll confirm the part from your model number, quote the installed price in writing, and schedule the work. Most hinge and roller replacements in Chandler are same-day.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Gate Repair help in Chandler? Licensed & insured · same-day response · free estimates
Call (520) 827-3159
Areas We Serve

Request a Free Estimate in Chandler

Tell us what you need - Vance Gate Repair Chandler responds fast. No obligation.

By reaching out through this form, you agree to the terms of our Privacy Policy and authorize us to contact you by phone, email, or text about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch